What belongs in a perpetual strategy change log?

A strategy change log records what changed, why it was proposed, which evidence informed the decision and what remained untouched for evaluation. Give every revision a distinct identity. Keep data, costs and rules traceable, including rejected ideas. The log is decision provenance; it does not replace backtesting or establish that the next version is better.

Which changes deserve their own version?

Entry, exit, sizing, admission gates and allowed instruments are strategy changes. Data repairs, execution assumptions, cost treatment and signal timestamps can also change a research result even when the entry rule is identical. Record them rather than hiding them under “same strategy.”

A documentation correction that changes no behavior can be labeled accordingly. If a clarification changes how a signal is interpreted, treat it as a behavioral revision. Strategy development defines the original plan; the change log preserves its subsequent history without rewriting what the old version meant.

What does one synthetic change record contain?

Research illustration only. Version A uses the last completed hourly bar for its context filter. Proposed version B changes only the required context condition. The record includes a unique change ID, proposal time in Asia/Shanghai, exact old and new rule text, hypothesis, input-data version, cost model, evaluation plan and decision status.

If B also changes stop distance and permitted sessions, it is a bundle of three behavioral changes, not an isolated test of the context condition. You can still study the bundle, but label the question honestly. Its result cannot identify which component caused a difference. No favorable performance is claimed for either version here.

How do you complete a five-step strategy change record?

  1. Identify the baseline. Save the current rule version, dataset identity, instrument set, sizing and execution assumptions. Link the prior decision record so the proposal starts from an auditable baseline rather than a remembered configuration.
  2. Write the proposed difference. Record exact old and new behavior, the hypothesis and whether this is one isolated change or a declared bundle. Include data or cost-model changes even if the entry condition is unchanged.
  3. Declare the evaluation boundary. Name the development sample, later untouched evaluation period, comparison measures and decision rule before inspecting the evaluation results. State what evidence would leave the proposal unresolved or rejected.
  4. Record the actual investigation. Save all examined variants, input versions, test dates, exceptions and results, including unfavorable runs. If the plan changes after inspection, open a new record instead of silently replacing the original procedure.
  5. Close with a decision. Mark accept for further evaluation, reject or unresolved with reasons and limitations. Preserve the original outputs and specify the next review boundary; a research decision is not an instruction to enable live trading.

Why is a result-informed revision not an untouched test?

Once you inspect an evaluation period to choose a rule, that period has informed development. Calling the next run on the same period “out of sample” does not restore the boundary. Walk-forward testing explains chronological separation; the log records which observations influenced each choice.

Parameter sensitivity testing examines nearby settings. This page does not duplicate that procedure: it records why a setting was considered, what else was tried and how the decision was made. Searching many variants and keeping only the winner's record hides the actual selection process.

How should rejected ideas and operational fixes appear?

Keep rejected and unresolved entries, not only accepted versions. A missing record can make the surviving history look more decisive than the investigation was. If a data-quality audit finds defective rows, link the repair and rerun scope so before/after results are not misattributed to a rule change.

A process correction from the adherence audit may require better evidence collection rather than a new entry rule. Label that distinction. The goal is a recoverable chain of reasoning, not frequent changes, a preferred count of experiments or a claim that version numbers measure trading skill.

Past performance does not guarantee future results.

What are the short answers on strategy change logs?

Should rejected ideas remain in the log?

Yes. Preserve the investigated variants, evidence and reasons, including unfavorable or unresolved proposals, so the selection history stays visible.

Can an inspected evaluation period remain untouched after I use it to choose a rule?

No. That inspection informed development. Record the boundary change and define a later evaluation plan rather than relabeling the same evidence.

Does an accepted research change mean it should be enabled live?

No. The log records a research decision and its limitations. Operational validation and any decision to trade remain separate.

Leveraged futures carry a high risk of loss.

Last reviewed by Ric Mescallado